Concrete Barrage, with a road bridge over Uhl river, power house, water conductor system, including intake structure, intake canal, decantation chambers, interconnecting duct and diurnal reservoir, concrete lined intake tunnel, rock excavation, drilling and grouting, foundation treatment, steel lining for ducts, diversion coffer dam and appurtenant works at Jogindernagar, Himachal Pradesh, India.


  • Excavation : 180,000 cu m
  • Concrete : 30,000 cu m
  • Purpose : Hydro Power Generation (50 MW)
  • Client : Punjab State Electricity Board, India